Skip to Main Content

ROSES 2010 Clarifications, corrections and amendments Clarification to D.8 Fermi Guest Investigator – Cycle 4

Description: D.8 Fermi Cycle 4 has been changed to remove reference to a "firm ceiling" in Sections 2.1 and 2.2.1 of the call.

Sections 2.1 and 2.2.1 of D.8 Fermi Cycle 4 have been changed to remove reference to a "firm ceiling". Civil servant salaries should be included in the estimated maximum total cost to NASA of the proposed investigation which is referred to in the call as the "budget cap". The phase 1 proposals are still due via http://fermi.gsfc.nasa.gov/ssc/proposals/ by 4:30 p.m. Eastern time on January 20, 2012.

Tags:

Subscribe to the SARA mailing list: