Suggested Searches

Blogs

    Full Day of Life Support and Computer Maintenance on Station

    Life support and computer maintenance filled the Expedition 67 crew schedule on Tuesday following a busy Labor Day aboard the International Space Station. The station’s four astronauts focused on a variety of biology and physics research on the U.S. holiday as they photographed growing vegetables and explored how fuel behaves in space. In the orbiting …

    Read Full Post

    Artemis I Launch Attempt Scrubbed

    The launch director waived off today’s Artemis I launch attempt at approximately 11:17 a.m. EDT. Teams encountered a liquid hydrogen leak while loading the propellant into the core stage of the Space Launch System rocket.  Multiple troubleshooting efforts to address the area of the leak by reseating a seal in the quick disconnect where liquid …

    Read Full Post

    Liquid Hydrogen Flow to Core Stage Resumes

    Launch controllers have started flowing liquid hydrogen to the core stage again after troubleshooting the reoccurrence of a leak. This time engineers attempted to reseat the seal in a quick disconnect cavity where the leak occurred by applying pressure to it with helium.

    Read Full Post

    Teams Troubleshoot Reoccurrence of Liquid Hydrogen Leak

    As engineers increased the pressure on the flow of liquid hydrogen into the core stage, a leak reoccurred. Engineers will attempt to reseat the seal in the quick disconnect cavity where the leak has been detected. This time they will stop flowing liquid hydrogen to the tank, close the valve used to fill and drain …

    Read Full Post

    Engineers Resume Flow of Liquid Hydrogen to Core Stage

    Launch controllers have resumed flow of liquid hydrogen to the core stage after warming up a quick disconnect in the engine section where a hydrogen leak was detected in the cavity between the ground and flight side plates of the quick disconnect. Teams warmed up the quick disconnect to attempt to reseat it and set …

    Read Full Post