Suggested Searches

Blogs

    Coverage Underway for Crew-2 Port Relocation

    NASA Television, the NASA app, and the agency’s website are providing live coverage as four residents of the International Space Station prepare to take a spin around their orbital neighborhood in the Crew Dragon Endeavour spacecraft, relocating it to prepare for the arrival of the agency’s Boeing Orbital Flight Test-2. NASA astronauts Shane Kimbrough and  Megan McArthur, JAXA (Japan Aerospace …

    Read Full Post

    NASA TV to Air Crew Dragon’s Port Relocation

    NASA’s SpaceX Crew-2 astronauts on the International Space Station will relocate their Crew Dragon Endeavour spacecraft Wednesday, July 21, setting the stage for a historic first when two different U.S. commercial spacecraft built for crew will be docked to the microgravity laboratory at the same time. Live coverage will begin at 6:30 a.m. EDT on NASA …

    Read Full Post

    ISS Daily Summary Report – 7/20/2021

    Payloads Cold Atom Lab (CAL): The crew completed the closeout procedures for the CAL Slice-7 Removal & Replacement (R&R). The CAL produces clouds of atoms that are chilled to about one ten billionth of a degree above absolute zero, much colder than the average temperature of deep space. At these low temperatures, atoms have almost …

    Read Full Post

    Mission Prep Heats Up Amid Science and Medical Studies

    Today, the Expedition 65 crewmates aboard the International Space Station continued down their checklists in preparation for the next day’s planned mission activities — to include a port-relocation maneuver and the launch of a new module that will replace the Pirs Docking Compartment. Pirs has only a few days left in its 20-year length of …

    Read Full Post

    First CubeSats Aboard for Artemis I Mission

    The first two CubeSats are aboard for the Artemis I mission as secondary payloads that will conduct a range of science experiments and technology demonstrations in deep space. In preparation for their missions, Lunar IceCube and Near-Earth Asteroid (NEA) Scout have been integrated with their dispensers and installed in the Orion stage adapter at NASA’s …

    Read Full Post

    ISS Daily Summary Report – 7/19/2021

    Payloads Combustion Integrated Rack (CIR) – Fluids and Combustion Facility: The crew exchanged the manifold #4 bottle with a bottle containing 100% C2H6. The CIR includes an optics bench, combustion chamber, fuel, and oxidizer control, and five different cameras for performing combustion investigations in microgravity. ESA-Education Payload Operations (EPO) Mission X Video: The crew recorded …

    Read Full Post

    Simulation and Station Maintenance Preface a Busy Week for the Crew

    As the week kicked off, the Expedition 65 crew members spent much of their Monday fine-tuning procedures in anticipation of Wednesday’s port-relocation activity, which will free up the Harmony’s forward port for the docking of Boeing’s CST-100 Starliner spacecraft to the International Space Station. That vehicle is scheduled for launch Friday, July 30, as part of NASA’s Boeing …

    Read Full Post

    ISS Daily Summary Report – 7/16/2021

    Payloads Human Research Facility-2 (HRF-2): The crew removed the Payload Ethernet Hub Bridge (PEHB) from the HRF-2 rack and replaced it with an improved Payload Ethernet Hub Gateway (PEHG). HRF-2 provides an on-orbit laboratory that enables human life science researchers to study and evaluate the physiological, behavioral and chemical changes induced by spaceflight. Research performed …

    Read Full Post

    Nanoparticles and Robotics Research Amid Maintenance Today

    The Expedition 65 crew members focused their Friday space research activities on nanoparticles and free-flying robotics. Their International Space Station maintenance activities included updating science communications hardware and replacing life support components. State-of-the-art space manufacturing techniques being studied on the orbital lab have the potential to improve building technologies on Earth. The new InSPACE-4 study, …

    Read Full Post

    ISS Daily Summary Report – 7/15/2021

    Payloads Cold Atom Lab (CAL): The crew performed the CAL Slice-7 Removal and Replacement (R&R). The closeout procedures were only partially completed due to the crew running out of time for the activity. The remainder of the closeout will be completed at a later date. The CAL produces clouds of atoms that are chilled to …

    Read Full Post