Suggested Searches

Blogs

    ISS Daily Summary Report – 3/04/2021

    Payloads Exploration Environmental Control and Life Support System: Brine Processor System (BPA): The crew installed the BPA hardware. The Exploration ECLSS: BPA is designed to improve water recycling on the ISS and boosts the efficiency of water recycling for the Artemis generation. Sally Ride Earth Knowledge Acquired by Middle Schools (EarthKAM): The crew performed a …

    Read Full Post

    NASA TV Broadcasts Spacewalk for Solar Array Mods on Friday

    NASA astronaut Kate Rubins and Japan Aerospace Exploration Agency (JAXA) astronaut Soichi Noguchi are scheduled to exit the International Space Station’s Quest airlock Friday for a spacewalk to complete the installation of solar array modification kits, which were started during the Feb. 28 spacewalk in preparation for solar array upgrades. The pair will set their spacesuits …

    Read Full Post

    ISS Daily Summary Report – 3/03/2021

    Payloads Exploration Environmental Control and Life Support System: Brine Processor System (BPA): The crew routed the power cable to the BPA hardware. The BPA is designed to improve water recycling on the International Space Station and boost the efficiency of water recycling for the Artemis generation. Dose Distribution Inside the ISS – 3D (DOSIS-3D): The …

    Read Full Post

    Green Run Update: Engineers Repair Valve for Mid-March Hot Fire Test

    Engineers have successfully repaired a liquid oxygen valve on the Space Launch System rocket’s core stage with subsequent checks confirming the valve to be operating properly. The team plans to power up the core stage for remaining functional checks later this week before moving forward with final preparations for a hot fire test in mid-March …

    Read Full Post

    High-Powered Computing, Orbital Plumbing and Spacewalk Preps Today

    Preparations are stepping up ahead of Friday’s spacewalk at the International Space Station to continue solar array modifications. The Expedition 64 crew is also studying high-powered space computing while maintaining orbital lab systems. Flight Engineers Kate Rubins and Soichi Noguchi are getting ready to begin a spacewalk on Friday to finish installing solar array modification …

    Read Full Post

    ISS Daily Summary Report – 3/02/2021

    Payloads Actiwatch Plus: A crewmember connected Actiwatch units to the Human Research Facility (HRF)-2 rack to allow ground teams to downlink data. The Actiwatch is a waterproof, nonintrusive, sleep-wake activity monitor worn on the wrist of a crewmember. The device contains a miniature uniaxial accelerometer that produces a signal as the subject moves. The data …

    Read Full Post

    Spacewalk, Science and BEAM Work Keeping Crew Busy

    Two astronauts are gearing up for another spacewalk scheduled this Friday to continue maintenance on the outside of the International Space Station. The rest of the Expedition 64 crew set up advanced research hardware and also entered BEAM for cargo activities. NASA astronaut Kate Rubins is readying tools and reviewing procedures for Friday’s spacewalk to …

    Read Full Post

    Artemis I Boosters Reach New Heights

    NASA’s Space Launch System (SLS) solid rocket boosters have grown taller with the addition of the fifth and final pair of motor segments in preparation for the launch of Artemis I later this year. At NASA’s Kennedy Space Center in Florida, engineers with Exploration Ground Systems lowered the final solid rocket booster into place on …

    Read Full Post

    ISS Daily Summary Report – 3/01/2021

    Payloads Sally Ride Earth Knowledge Acquired by Middle Schools (EarthKAM): A crewmember performed a setup and activation of the EarthKam hardware in Node-2. EarthKAM allows thousands of students to photograph and examine Earth from a space crew’s perspective. Using the Internet, the students control a special digital camera mounted on-board the ISS. This enables them …

    Read Full Post

    ISS Daily Summary Report – 2/28/2021

    USOS Extravehicular Activity (EVA) #71 – ISS Roll Out Solar Array (IROSA) Prep: Today, EV1 Kate Rubins and EV2 Victor Glover performed a 7 hour 4 minute EVA and completed the following tasks in support of the IROSA Prep EVA: Build the 2B Upper Bracket Install the 2B Center Pad to Mast Canister Install the …

    Read Full Post