Suggested Searches

Blogs

    ISS Daily Summary Report – 2/01/2018

    NanoRacks DreamUp Xtronaut Crystal Growth (DreamXCG):  The crew used hot water from the PWD to dissolve sugar crystals in two pouches and later transfer sugar water into the pouches with seeded dowels. This investigation teaches students about the effects of microgravity on crystal formations using near-identical flight kits flown and operated aboard the International Space …

    Read Full Post

    Cosmonauts Complete Spacewalk Preps, More Eye Checks for Rest of Crew

    A pair of cosmonauts have wrapped up preparations for Friday morning’s spacewalk to work on the Russian segment of the International Space Station. The other four Expedition 54 crew members continued more eye exams throughout the day on Thursday. Commander Alexander Misurkin and Flight Engineer Anton Shkaplerov completed a spacewalk procedures review today, finished collecting …

    Read Full Post

    ISS Daily Summary Report – 1/31/2018

    Synchronized Position Hold, Engage, Reorient, Experimental Satellites (SPHERES) SmoothNav: The crew set up the SPHERES work area to activate and check out the hardware and EXPRESS laptop computer (ELC) before conducting the SmoothNav experiment run. SmoothNav develops an estimation algorithm aggregating relative state measurements between multiple, small, and potentially differently instrumented spacecraft. The algorithm obtains …

    Read Full Post

    SPHERES Science and Vision Checks Ahead of Friday Spacewalk

    As the International Space Program gets ready for a pair of spacewalks in February, the Expedition 54 crew was busy setting up a pair of experimental internal satellites and conducting vision checks today. NASA astronauts Joe Acaba and Mark Vande Hei brought out a pair of tiny satellites, also known as SPHERES (Synchronized Position Hold, …

    Read Full Post

    ISS Daily Summary Report – 1/30/2018

    Personal CO2 Monitor Sensor Calibration: Today the crew will perform a single point calibration of the Personal CO2 monitors using and iPad and readings from a Major Constituent Analyzer (MCA) sample port. The Personal CO2 Monitor demonstrates a system capable of unobtrusively collecting and downlinking individual crew members’ CO2 exposure for weeks to months. This …

    Read Full Post

    Parker Solar Probe Begins Space Environment Testing

    People in clean suits work on the spacecraft inside a large chamber

    On Saturday, Jan. 27, NASA’s Parker Solar Probe began space environment testing, starting with the air being pumped out of the 40-foot-tall thermal vacuum chamber at NASA’s Goddard Space Flight Center in Greenbelt, Maryland where the spacecraft is currently housed. The chamber – officially called the Space Environment Simulator – creates a nearly identical replication of the conditions the spacecraft will face during its mission to the Sun.

    Read Full Post

    Rescheduled Robotics Work Makes Two Spacewalks in February

    International Space Station managers have rescheduled a U.S. spacewalk postponed on Monday to mid-February. Meanwhile, the Expedition 54 crew is also preparing for a Russian spacewalk this Friday. Astronauts Mark Vande Hei and Norishige Kanai are planning to begin their spacewalk Feb. 15 at 7:10 a.m. EST to stow and reposition a pair of Latching …

    Read Full Post

    ISS Daily Summary Report – 1/29/2018

    USOS ExtraVehicular Activity (EVA) 48 status:  Over the weekend, ground teams were able to identify a root cause and a fix for the Space Station Remote Manipulator System (SSRMS) Latching End Effector (LEE) anomaly seen after USOS EVA 47.  Because of this, the EVA to return the LEE to the configuration prior to EVA 47 …

    Read Full Post

    Centaur Upper Stage Arrives at Delta Operations Center

    Under the watchful eyes of technicians and engineers, the Centaur upper stage that will help launch NOAA's Geostationary Operational Environmental Satellite-S, or GOES-S, is lifted from its transporter inside the Delta Operations Center at Cape Canaveral Air Force Station for further processing.

    The Centaur upper stage, part of the United Launch Alliance Atlas V rocket that will help launch NOAA's Geostationary Operational Environmental Satellite-S, is in place for prelaunch processing. The Centaur arrived at the Delta Operations Center at Cape Canaveral Air Force Station on Jan. 24, two days after its delivery by ship to nearby Port …

    Read Full Post

    Crew Looking Ahead to Friday Russian Spacewalk

    Expedition 54 is now focusing on Friday’s spacewalk to install and remove gear on the Russian side of the International Space Station. This comes after today’s spacewalk to work on the Canadarm2 robotic arm was postponed to mid-February. Cosmonauts Alexander Misurkin and Anton Shkaplerov will put on their Orlan spacesuits Friday and exit the Pirs …

    Read Full Post