Due to the lapse in federal government funding, NASA is not updating this website.

Suggested Searches

Blogs

    ISS Daily Summary Report – 3/08/2018

    Plant Gravity Perception (PGP): Today the crew replaced four of the European Modular Cultivation System (EMCS) Experiment Containers (ECs) for the next Plant Gravity Perception experiment run. Two of the ECs powered up and remained powered.  For this investigation, normal and mutated forms of thale cress, a model research plant, are germinated to support the …

    Read Full Post

    Plant and Flame Studies Alongside Plumbing, Life Support Work

    Aboard the International Space Station, the Expedition 55 crew continued exploring how plants adapt to gravity and began preparing for a suite of combustion experiments. The trio is also continuing the maintenance of the station’s life support systems and its microgravity science operations. NASA astronaut Scott Tingle put his green thumb to work today supporting …

    Read Full Post

    ISS Daily Summary Report – 3/07/2018

    Airway Monitoring:  In support of the European Space Agency (ESA) Airway Monitoring investigation, today the crew completed calibration of the hardware in the US Laboratory and then completed two different measurement protocols; the low Nitric Oxide (NO) protocol which determines how much NO is exhaled with respiration, and the high NO protocol, which determines how …

    Read Full Post

    Station Upkeep and Orbital Science as Ground Crew Trains

    The three orbiting Expedition 55 crew members focused on maintenance of the International Space Station while studying Earth and biomedical sciences today. Meanwhile, a new set of station crewmates are in Kazakhstan for final training before beginning their mission in two weeks. Commander Anton Shkaplerov once again worked throughout Wednesday on life support maintenance in …

    Read Full Post

    ISS Daily Summary Report – 3/06/2018

    Airway Monitoring:  In support of the European Space Agency (ESA) Airway Monitoring investigation, today the crew set up hardware in the US Laboratory for nitric oxide measurements to be taken tomorrow. Airway Monitoring aims to determine the pulmonary nitric oxide turnover in weightlessness and in combined weightless, hypobaric and hypoxic environments as well as determining …

    Read Full Post

    Solar Panels Opened on NASA’s TESS Satellite

    Solar panels are deployed on NASA's TESS satellite in the Payload Hazardous Servicing Facility at Kennedy Space Center.

    Technicians dressed in clean room suits check the solar panels, which were deployed, on NASA's Transiting Exoplanet Survey Satellite (TESS) inside the Payload Hazardous Servicing Facility (PHSF) at the agency's Kennedy Space Center in Florida. Inside the PHSF, the satellite is being processed and prepared for its flight. TESS is scheduled to launch April 16, …

    Read Full Post

    Busy Day Aboard Station Ahead of New Crew Launch

    The orbiting Expedition 55 crew members participated in a variety of biology research and life support maintenance today. Their counterparts on the ground took part in traditional ceremonies today ahead of their liftoff to the International Space Station in two weeks. NASA astronaut Scott Tingle started his day photographing and watering plants being grown for …

    Read Full Post

    ISS Daily Summary Report – 3/05/2018

    Combustion Integrated Rack (CIR) Advanced Combustion via Microgravity Experiments (ACME) Electric-Field Effects on Laminar Diffusion (E-Field) Flames:  The crew replaced the compensator module in the CIR Hi Bit-depth Multi-Spectral (HiBMS) Imaging package today.  This is in preparation for the upcoming ACME E-Field Flames investigation. The ACME investigation is a set of five independent studies of …

    Read Full Post

    New Crew Arrives at Launch Site Before March 21 Liftoff

    The next three International Space Station crew members arrived at their launch site Sunday at the Baikonur Cosmodrome in Kazakhstan. Cosmonaut Oleg Artemyev and NASA astronauts Ricky Arnold and Drew Feustel are in final launch preparations ahead of their March 21 launch to their new home in space. They suited up in their Russian Sokol …

    Read Full Post

    ISS Daily Summary Report – 3/02/2018

    Node 3 Major Constituent Analyzer (MCA) Calibration Failure: Yesterday, the crew successfully replaced the N3 MCA Verification Gas Assembly (VGA) as part of regularly scheduled maintenance. During calibration, however, data was off-nominal and the planned full calibration failed to complete.  Teams continue to work a forward plan to restore full N3 MCA functionality. SUPVIS-Justin:  The …

    Read Full Post