Suggested Searches

Blogs

    ISS Daily Summary Report – 2/21/2017

    Preparation for Dragon Arrival:  Dragon successfully lifted off on the SpaceX Falcon 9 rocket from Launch Pad 39A at Kennedy Space Center, Florida Sunday 19-February at 8:39 am CST.  Today Dragon will continue to phase towards the ISS for a planned capture on Wednesday 22-February at approximately 5:00 am CST.  Onboard the ISS the USOS …

    Read Full Post

    Media View New Work Platforms for NASA’s Space Launch System

    Members of the news media recently viewed the ten levels of new work platforms inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. Work to install the platforms came to conclusion Jan. 12 as the final work platform, A north, was lifted, installed and secured on its rail …

    Read Full Post

    Busy Traffic Week Ahead for Space Station Crew

    Two cargo craft are scheduled to deliver several tons of supplies and experiment hardware to the station this week. SpaceX’s tenth commercial resupply mission lifted off at 9:39 a.m. EST on Sunday, Feb. 19. The rocket launched from Launch Complex 39A at NASA’s Kennedy Space Center in Florida. This was the first commercial launch from …

    Read Full Post

    Dragon Launches to Station, Arrives Wednesday

    The Falcon 9 rocket lifted off at 9:39 a.m. EST, and Dragon has begun its journey to the International Space Station with an arrival scheduled for Wednesday. Dragon separated from the Falcon 9 about 10 minutes after launch. For more information on the SpaceX CRS-10 mission, visit: http://www.nasa.gov/spacex. For more information about the International Space …

    Read Full Post

    ISS Daily Summary Report – 2/18/2017

    With the delay in SpaceX-10 launch, Monday will be an off duty day for the ISS crew.  There will be no IMC reports sent on Monday, February 20th. Nominal reporting will resume Tuesday morning.

    Read Full Post

    ISS Daily Summary Report – 2/17/2017

    NanoRack Cubesat Deployer (NRCSD) #10 Installation: This morning the crew installed two Quad deployers on the attachment mechanisms on the JEM Airlock (JEMAL) Slide Table. Only one Quad has satellites loaded, the second Quad is required for proper fit of the Multi-Layered Insulation (MLI) protective cover.  The deployment is scheduled for after the berthing and …

    Read Full Post

    Dragon Capture Training and Robonaut Power Check Today

    Three Expedition 50 crew members practiced today the robotic capture of the SpaceX Dragon resupply ship when it arrives at the International Space Station two days after its launch. A humanoid robot, better known as Robonaut, had its power supply checked out during a full day of troubleshooting. Commander Shane Kimbrough and Flight Engineer Thomas …

    Read Full Post

    ISS Daily Summary Report – 2/16/2017

    Transition to (X2) R15 Software:  As part of the R15 software transition, the Starboard 1 (S1) and Port 1 (P1) Multiplexer/Demultiplexers (MDMs) were transitioned to updated software S1P1 R6. Updates to the S1 and P1 MDMs include:  Longeron Fault Detection Isolation & Recovery (FDIR) updates to protect for Beta Gimbal Assembly (BGA) stall conditions Thermal …

    Read Full Post

    Commander Sets Up Dragon Gear and Looks to April Crew Swap

    The Expedition 50 crew is getting ready for the upcoming SpaceX CRS-10 mission to resupply the International Space Station. Commander Shane Kimbrough checked out SpaceX communications gear today so the astronauts can monitor the approach and rendezvous of the Dragon cargo craft. SpaceX is targeting Feb. 18 to launch its Dragon space freighter atop a …

    Read Full Post

    ISS Daily Summary Report – 2/15/2017

    Transition to (X2) R15 Software:  As part of the R15 software transition, the Payload (PL) Multiplexer/Demultiplexers (MDMs) were transitioned to updated software Payload Executive Processor R12 (PEP R12) today. Updates to the PL MDMs include:  Redundancy Management Time Reduction Additionally, the Lab-1 (LA-1) MDM was transitioned to Lab System-R5 (LSYS1-R5) software. Updates to the LA-1 …

    Read Full Post