Suggested Searches

Blogs

    ISS Daily Summary Report – 9/06/2018

    Airway Monitoring: Today the crew continued the preparatory activities for the GMT 250 Airway Monitoring US Airlock Session. These activities included setting up the camera and hardware required for Airway Monitoring in the US Airlock. The Airway Monitoring investigation aims to determine in detail the pulmonary nitric oxide turnover in weightlessness and in combined weightless, …

    Read Full Post

    ISS Daily Summary Report – 9/05/2018

    Airway Monitoring: Today the crew performed preparatory activities for the GMT 250 Airway Monitoring US Airlock Session. These activities include review of big picture words, hardware location, etc. The Airway Monitoring investigation aims to determine in detail the pulmonary nitric oxide turnover in weightlessness and in combined weightless, hypobaric and hypoxic environments as well as …

    Read Full Post

    Science Gear Work, Japan Spaceship Preps Ahead of Orbital Reboost

    The Expedition 56 crew members conducted maintenance work on a variety of advanced science gear today to ensure ongoing space research aboard the International Space Station. The crew also continued a pair of exercise studies and trained to capture a Japanese cargo craft before tonight’s orbital reboost of the station. Commander Drew Feustel spent Wednesday …

    Read Full Post

    ISS Daily Summary Report – 9/04/2018

    Binary Colloidal Alloy Test – Cohesive Sediment (BCAT-CS): On Sunday, the crew checked the camera alignment and focus by viewing the latest BCAT images on a laptop.  TheBCAT-CS investigation studies the forces between particles that cluster together by using sediments of quartz and clay particles.  Conducting the research in the microgravity environment of the ISS …

    Read Full Post

    ISS Daily Summary Report – 8/31/2018

    Out-of-Spec ISS Cabin Pressure Decrease: Following the initial leak repair yesterday, the ISS was repressurized to nominal pressure using Progress assets.  Today, the Russian crew performed additional activities for the leak repair.  There was still a small leak path which the crew sealed as they continued with the repair. An additional level of repair will …

    Read Full Post