H-II Transfer Vehicle (HTV)-7 Launch: Today’s launch attempt was scrubbed due to a technical issue. Binary Colloidal Alloy Test – Cohesive Sediment (BCAT-CS): The crew checked the camera alignment and focus by viewing the latest BCAT images on a laptop. BCAT-CS focuses on the study of forces between particles that cluster together by using sediments …
Parker Solar Probe’s Solar Array Cooling System Fully Activated

On Sept. 13, Parker Solar Probe's first-of-its-kind water-cooled Solar Array Cooling System (or SACS) was made fully operational.
ICON Launch Delayed; New Launch Date to Come

NASA and Northrop Grumman have decided to delay the launch of the agency's Ionospheric Connection Explorer, or ICON, to allow time to address a quality issue with a vendor-supplied electrical connector on the launch vehicle. Northrop Grumman does not expect an extended delay and will work with the range to determine a new launch date. …
Japan Set To Launch Resupply Ship to Station Today

The Japan Aerospace Exploration Agency (JAXA) is scheduled to launch a cargo spacecraft from the Tanegashima Space Center in southern Japan today at 4:59 p.m. EDT (5:59 a.m. Sept. 15 Japan standard time). Live coverage of the launch will begin at 4:30 p.m. on NASA Television and the agency’s website. The unpiloted H-II Transfer Vehicle-7 (HTV-7) is …
Tower Rollback Friday, Live Launch Coverage Saturday

NASA's Ice, Cloud and land Elevation Satellite-2, or ICESat-2, a mission to measure the changing height of Earth's ice, is scheduled to launch Saturday, Sept. 15, with a 40-minute window opening at 5:46 a.m. PDT (8:46 a.m. EDT). The spacecraft will lift off from Space Launch Complex 2 (SLC-2) at Vandenberg Air Force Base in …
ISS Daily Summary Report – 9/13/2018
Rodent Research-7 (RR-7): The crew completed the second of two days of rodent operations for the RR-7 investigation. Crewmembers will perform bone densitometer scans, blood draws, fecal pellet collections, and sampling operations. They also completed cleaning of the rodent habitats. The RR-7 investigation examines how the space environment affects the community of microorganisms in the …
ICESat-2 Proceeds Toward Launch Sept. 15

NASA's Ice, Cloud and land Elevation Satellite-2, or ICESat-2, mission and launch teams today concluded a successful Launch Readiness Review. There are no technical issues being worked at this time. Teams are proceeding toward liftoff from California's Vandenberg Air Force Base on Saturday, Sept. 15, at 5:46 a.m. PDT (8:46 a.m. EDT) on a United …
ICESat-2 Prelaunch Mission Briefing Today

NASA's Ice, Cloud and land Elevation Satellite-2, or ICESat-2, is being prepared for liftoff Saturday aboard a United Launch Alliance Delta II rocket from Space Launch Complex-2 at Vandenberg Air Force Base in California. The launch window opens at 8:46 a.m. EDT (5:46 a.m. PDT). NASA will host a prelaunch mission briefing today at 4 …
Station Preps For Japan Resupply Ship as Next Crew Readies for Mission

Japan is poised to launch its HTV-7 resupply ship, nicknamed the Kounotori, loaded with over five tons of cargo to the International Space Station on Friday, U.S. time. Back on Earth, a new crew is preparing for its launch from Kazakhstan next month to the orbital lab. JAXA’s (Japan Aerospace Exploration Agency) H-IIB rocket is …


