Against the midnight blue of a high-altitude sky, Orbital Sciences’ Pegasus winged rocket booster ignited after being dropped from NASA’s…
EC94-42421-20Calibration setup fpr LSRA CV-990 in Flight Loads Laboratory.9 Feb 1994NASA Photo / › Flight Loads Lab Description
AeroVironment ground crew checked out the operation of the Pathfinder-Plus solar aircraft’s electric motors during combined systems tests on Rogers…
This Lockheed T-33A arrived at NASA FRC January 9, 1963. It departed September 10, 1973 to Redding, CA.
The T-33A (55-4351/NASA 815) arrived at NASA FRC January 9, 1963; departed September 10, 1973 to Redding, CA.
The T-33 #351 Cockpit control panel.
A Lockheed T-33A (49-0939) Jet Trainer. This aircraft arrived at the NACA High-Speed Flight Station February 5, 1958. It departed…
The NASA Dryden Flow Visualization Facility (FVF) was built in 1983 and is part of the Dryden Flight Research Center…
The dual throttles and black box at the top of the instrument panel of an early version of the F-15…
Combiner heating, loading, and pressurization imposed on wing and eleven section of the Space Shuttle to simulate reentry conditions.