Suggested Searches

Image Article

‘Hidden Figures Way’ Dedication at NASA Headquarters
‘Hidden Figures Way’ Dedication at NASA Headquarters

NASA Administrator Jim Bridenstine, left, U.S. Senator Ted Cruz, R-Texas, second from left, D.C. Council Chairman Phil Mendelson, third from…

X-56A Has a Busy Control Room
X-56A Has a Busy Control Room

The X-56A flies a research flight in the skies above Edwards Air Force Base.

X-56A Has a Busy Control Room
X-56A Has a Busy Control Room

Chris Miller, who was test conductor on this X-56 A flight, prepares for the start of the mission.

X-56A Has a Busy Control Room
X-56A Has a Busy Control Room

The X-56A has a busy control room with about a dozen people contributing to a mission.

This Week in NASA History: Marshall Completes Structural Assembly of S-IU-500V – June 14, 1965
This Week in NASA History: Marshall Completes Structural Assembly of S-IU-500V – June 14, 1965

This week in 1965, NASA’s Marshall Space Flight Center completed structural assembly of the Saturn V vibration test article, S-IU-500V.

X-56A Has a Busy Control Room
X-56A Has a Busy Control Room

Cheng Moua, X-56A project manager, prepares for an X-56A mission in the control room.

X-56A Has a Busy Control Room
X-56A Has a Busy Control Room

Mai Franz, Samson Truong and Alex Chin continue preparations for flight of the remotely piloted X-56A.

X-56A Has a Busy Control Room
X-56A Has a Busy Control Room

Peter Suh and Jeff Ouellette complete preflight checks of the remotely piloted X-56A.

X-56A Has a Busy Control Room
X-56A Has a Busy Control Room

Alex Chin, Samson Truong and Mei Franz prepare for a flight of the remotely piloted X-56A

NASA’s Webb Sunshield Undergoes Rocket Fitting, More Testing
NASA’s Webb Sunshield Undergoes Rocket Fitting, More Testing

NASA’s James Webb Space Telescope’s spacecraft element, which consists of the observatory’s spacecraft bus and the sunshield, was put in…