Suggested Searches

Blogs

    ISS Daily Summary Report – 03/05/14

    Water Recovery System (WRS) In-Flight Maintenance (IFM) Procedure Review: On February 25th, the Water Processor Assembly (WPA) had a fault due to a leak into catalytic reactor (approximately 1 liter of water). The catalytic reactor is scheduled to be removed and replaced (R&Rd) tomorrow.  Flight Engineer (FE)-3 Hopkins and FE-5 Mastracchio conducted a procedures review …

    Read Full Post

    ISS Daily Summary Report – 03/04/14

    Aniso Tubule Light Treatment:  Flight Engineer (FE)-6 Wakata retrieved an Aniso Tubule sample from a Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI) and attached a Ziplock bag containing the Sample Chamber onto a Cell Biology Experiment Facility (CBEF) door to expose it to light.  This is the fifth of five planned runs.  Later …

    Read Full Post

    NASA Cameras Capture Another Fireball

    A bright fireball was detected at extreme range (hundreds of kilometers) by two NASA meteor cameras located at the Pisgah Astronomical Research Institute (PARI) in North Carolina, and at Hiram College in Ohio. At such distances (286 miles in the case of the PARI camera), trajectory determination is quite difficult. The fireball was first detected on …

    Read Full Post

    ISS Daily Summary Report – 03/03/14

    Cube Satellite (CubeSat) Closeout Operations:  Today, Flight Engineer (FE) 6 Wakata and FE-3 Hopkins closed out the Nanorack Cubesat Deployer (NRCSD) operations.  This morning the slide table was moved from the Japanese Experiment Module (JEM) Airlock into the JEM Pressurized Module (JPM).  Later, the crew removed the empty Nanoracks Cubesat Deployers (NRCSDs) and Multi-Purpose Experiment …

    Read Full Post

    ISS Daily Summary Report – 02/28/14

    Cube Satellite (CubeSat) Operations:  Overnight the final 7 CubeSats were successfully launched by JAXA Robotic Flight Controllers from two NanoRacks CubeSat Deployers (NRCSDs).  Two Dove CubeSats and ArduSat-2, LitSat-1, LituanicaSat-1, UaPSat-1, and SkyCube CubeSats were launched.  A total of 17 CubeSats have been deployed from the NRCSDs this week. The NRCSDs and Multi-Purpose Experiment Platform …

    Read Full Post

    ISS Daily Summary Report – 02/27/14

    Cube Satellite (CubeSat) Operations:  Four more CubeSats were successfully launched overnight by JAXA Robotic Flight Controllers from two NanoRacks CubeSat Deployers (NRCSDs).  The remaining 7 CubeSats will be deployed overnight.  CubeSat format satellites are launched from the ISS for a variety of commercial and national customers. Try Zero-Gravity (Try Zero-G) Experiments:  Flight Engineer (FE)-6 Wakata set …

    Read Full Post

    ISS Daily Summary Report – 02/26/14

    Cube Satellite (CubeSat) Operations and Deploys: Overnight 4 CubeSats were successfully launched by JAXA Robotic Flight Controllers from two NanoRacks CubeSat Deployer (NRCSD) locations.  Eleven more satellites will be deployed in the next 2 days.  CubeSat format satellites are launched from the ISS for a variety of commercial and national customers. Radiation Dosimetry Inside ISS-Neutrons …

    Read Full Post

    ISS Daily Summary Report – 02/25/14

    Cube Satellite (CubeSat) Operations and Deploys: This morning, Flight Engineer (FE)-6 Wakata depressurized the Japanese Experiment Module (JEM) Airlock, opened the outer hatch and extended the slide table out to the JEM Exposed Facility (JEF) on the exterior of the ISS. JAXA Flight Controllers removed the 8 NanoRacks CubeSat Deployers (NRCSDs) from the slide table …

    Read Full Post

    An Unusual First Stage Photo

    SpaceX CEO Elon Musk released this photo yesterday of the first stage of the Falcon 9 rocket that will launch the SpaceX-3 mission to the International Space Station. The unusual feature is the landing legs on the side of the rocket. According to Musk, they are 60 feet in diameter. He said the booster will …

    Read Full Post

    ISS Daily Summary Report – 02/24/14

    Growth of Homogeneous SiGe Crystals in Microgravity by the TLZ Method (Hicari)  Experiment:  Flight Engineer (FE)-6 Wakata removed the Sample Cartridge Serial Number 004 from Sample Cartridge Automatic Exchange Mechanism (SCAM) holder #4. The materials science investigation Growth of Homogeneous Silicon-Germanium (SiGe) Crystals in Microgravity by the TLZ Method (Hicari) aims to verify the crystal-growth …

    Read Full Post