Suggested Searches

Blogs

    ISS Daily Summary Report – 05/29/15

    Fluid Shifts Baseline Imagery Collection:  Kornienko performed his Flight Day 45 baseline imaging for the Fluid Shifts experiment.  With Padalka as the onboard imager and ground remote guidance, ultrasound imaging was taken of arterial and venous measures of the head and neck, cardiac, ophthalmic and portal vein, and tissue thickness of lower and upper body.  …

    Read Full Post

    Crew Finalizes Module Remodeling Work

    The Expedition 43 crew is wrapping up the remodeling of the Leonardo Permanent Multipurpose Module (PMM) at its new location on the forward port of the Tranquility module. The station residents also participated in maintenance and experiments exploring the long-term effects of living in space on the human body. Commander Terry Virts and One-Year crew …

    Read Full Post

    ISS Daily Summary Report – 05/28/15

    Permanent Multipurpose Module (PMM) Relocation:  This morning the crew completed the Node 3 Forward vestibule outfitting.  The PMM hatch was opened and the crew ingressed the PMM in its new location.  While attempting to install the supply and return Intermodule Ventilation (IMV) jumpers, it was determined that the Node 3 and PMM interfaces are offset, …

    Read Full Post

    Leonardo Cargo Module Reopens for Business

    The Leonardo Permanent Multipurpose Module (PMM) has been reopened at its new location on the forward port of the Tranquility module. Commander Terry Virts and Flight Engineer Samantha Cristoforetti worked on completing PMM configuration activities. Meanwhile, the Expedition 43 crew went about its scheduled tasks of microgravity science and orbital maintenance. One-Year crew member Scott …

    Read Full Post

    ISS Daily Summary Report – 05/27/15

    Permanent Multipurpose Module (PMM) Relocation:  In support of today’s PMM relocation, the crew has powered up the Centerline Berthing Camera System (CBCS) on the Node 3 Forward hatch and performed the Node 1 Nadir Common Berthing Mechanism (CBM) bolt loosening and removal.  Robotic Flight Controllers then unberthed PMM from Node 1 nadir at 05:00 am …

    Read Full Post

    Leonardo Cargo Module Bolted to New Home

    The Leonardo Permanent Multipurpose Module (PMM) was successfully relocated from the Unity module to the Tranquility module Wednesday morning. Engineers from Canada and Houston jointly maneuvered the PMM with the Canadarm2 robotic arm. Astronauts Terry Virts and Scott Kelly monitored the installation then successfully bolted the PMM in place on Tranquility. The duo are now …

    Read Full Post

    Module Relocated Prepping Station for Commercial Crew

    The Permanent Multipurpose Module (PMM) was successfully relocated from the Unity module to the Tranquility module at 9:08 a.m. EDT Wednesday. The PMM was robotically relocated from the Earth-facing port of the Unity module on the International Space Station to the forward port of the Tranquility module in the next step to reconfigure the complex …

    Read Full Post

    Watch NASA TV at 8 a.m. EDT for Robotics Move

    The International Space Station’s Permanent Multipurpose Module (PMM) was detached from a berthing mechanism on the Earth-facing port of the Unity module at 5:50 a.m. EDT by robotics flight controllers at Mission Control, Houston, working in tandem with Canadian Space Agency (CSA) engineers at the robotics support center located at CSA Headquarters in St. Hubert, Quebec, Canada. Used as a …

    Read Full Post

    ISS Daily Summary Report – 05/26/2015

    Fine Motor Skills (FMS): Kelly and Kornienko performed their Flight Day 60 FMS sessions this morning.  In the Fine Motor Skills experiment, crew members perform a series of interactive tasks on a touchscreen tablet. Fine motor skills are crucial for successfully interacting with touch-based technologies, repairing sensitive equipment, and a variety of other tasks. In …

    Read Full Post

    Station Preps for Module Relocation Work

    A cargo module is getting ready to be relocated from the Unity module to the Tranquility module Wednesday morning. Meanwhile, the crew also conducted science, health checks and Japanese robotics work. Commander Terry Virts and One-Year crew member Scott Kelly prepared the Permanent Multipurpose Module (PMM) for its relocation. The duo closed the hatch on …

    Read Full Post