Suggested Searches

Image Article

Artemis I Rolls to the Launch Pad for Testing
Artemis I Rolls to the Launch Pad for Testing

The rocket rolled out on March 17, 2022, for a launch rehearsal.

El cohete lunar de Artemis I está listo para rodar
El cohete lunar de Artemis I está listo para rodar

El cohete lunar de Artemis I está listo para rodar

Artemis I First Rollout
Artemis I First Rollout

NASA’s Space Launch Syste rocket with the Orion spacecraft aboard is seen atop a mobile launcher in High Bay 3…

NASA spacewalker Raja Chari is pictured tethered to the station
NASA spacewalker Raja Chari is pictured tethered to the station

NASA astronaut Raja Chari is pictured tethered to the International Space Station during a six-hour and 54-minute spacewalk.

NASA spacewalker Kayla Barron takes a “space-selfie”
NASA spacewalker Kayla Barron takes a “space-selfie”

NASA astronaut Kayla Barron points the camera toward herself with her spaceuit’s helmet shield down and takes a “space-selfie.”

NASA spacewalker Raja Chari is pictured tethered to the station
NASA spacewalker Raja Chari is pictured tethered to the station

NASA astronaut Raja Chari is pictured tethered to the International Space Station during a six-hour and 54-minute spacewalk.

NASA spacewalker Kayla Barron installs a solar array modification kit
NASA spacewalker Kayla Barron installs a solar array modification kit

NASA astronaut Kayla Barron is pictured installing a modification kit on the International Space Station’s Port-4 truss segment.