Payloads: Electromagnetic Levitator (EML): The EML high speed camera was set to Standard (STD) measurement mode. The EML is a facility composed of four inserts installed into the European Drawer Rack (EDR) for the electromagnetic levitation of samples. The experiment samples are installed in a dedicated sample chamber that is attached to EML and can …
Safety Training, Space Botany, Robotics Practice and Spacesuit Maintenance Today

The seven-member Expedition 69 crew is keeping busy Tuesday with a round of training, prepping for an upcoming cargo delivery and tending to plants aboard the International Space Station. NASA Flight Engineer Frank Rubio, joined by Commander Sergey Prokopyev and Flight Engineer Dmitri Petelin of Roscosmos began the day with a round of safety training. …
July Puzzler
Your challenge is to tell us the location of the satellite image and why it is interesting.
ISS Daily Summary Report – 7/24/2023
Payloads: Astrobee: The perching arm was removed from the Astrobee flyer. Astrobee is made up of three free-flying, cube-shaped robots. These robots are designed to help scientists and engineers develop and test technologies for use in microgravity to assist astronauts with routine chores and give ground controllers additional eyes and ears on the space station. …
Space Biology, Human Health Research and Robotics Work to Kick off Week

The Expedition 69 crew aboard the International Space Station is keeping busy on Monday with Genes in Space operations, human health research, robotics work, and station maintenance. NASA Flight Engineer Frank Rubio started his day removing hard drives for future return. Following last week’s session, Rubio once again booted up the Surface Avatar laptop computer …
NASA’s Starling Commissioning Begins, Team Works to Bolster Comms
Each of NASA’s four Starling spacecraft stabilized themselves, deployed solar panels, and made initial contact shortly after their July 17 launch. Starling operators report nominal health for all the CubeSats. The spacecraft are undergoing a series of preparation and testing activities, called commissioning, ahead of their mission to demonstrate autonomous communications, positioning, maneuvering, and decision-making …
ISS Daily Summary Report – 7/21/2023
Payloads: Astrobee: The Astrobee flyers were prepped and JEM stowage was cleared in preparation for remote video operations. Astrobee is made up of three free-flying, cube-shaped robots. These robots are designed to help scientists and engineers develop and test technologies for use in microgravity to assist astronauts with routine chores, and give ground controllers additional …
Space Biology, Upcoming Mission Training and Eye Checks End Work Week

Two Expedition 69 crew members are preparing for the upcoming Northrop Grumman cargo resupply mission. Space biology and another round of eye exams are also underway today aboard the International Space Station. NASA astronauts Frank Rubio and Woody Hoburg spent most of their morning reviewing procedures and completing training for Northrop Grumman’s 19th commercial resupply …
ISS Daily Summary Report – 7/20/2023
Payloads: BioFabrication Facility (BFF): Media bags were retrieved from the Iceberg-1 cold stowage facility and were temporarily stowed near the BFF facility. Using 3D biological printers to produce usable human organs has long been a dream of scientists and doctors around the globe; however, printing the tiny, complex structures found inside human organs, such as …


