Suggested Searches

1 Min Read

ASTERIA CubeSat Before Launch

This image shows Electrical Test Engineer Esha Murty and Integration and Test Lead Cody Colley preparing the ASTERIA spacecraft for mass-properties measurements in April 2017.
PIA23406
Credits: NASA/JPL-Caltech
Image Addition Date:
Mission(s):

Description

Left to right: Electrical Test Engineer Esha Murty and Integration and Test Lead Cody Colley prepare the ASTERIA spacecraft for mass-properties measurements in April 2017 prior to spacecraft delivery ahead of launch. ASTERIA was deployed from the International Space Station in November 2017.

For more information about CubeSat see www.jpl.nasa.gov/cubesat/.